97精品人妻系列无码人妻-一边摸一边做爽的视频17国产-最近免费中文字幕-无套内内射视频网站

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 色综合色狠狠天天综合色| 色噜噜狠狠一区二区三区| 美女裸体自慰在线观看| 中国极品少妇videossexhd| 国产精品美女久久久久av爽| 久久婷婷五月综合色精品| 特级毛片a级毛片免费播放| 国产美女牲交视频| 熟妇乱子作爱视频大陆| 麻花豆剧天美星空| 桃花色综合影院| 搡老熟女国产| 黑人操亚洲女人| 六十路高龄老熟女m| 成人乱码一区二区三区四区| 久久久久黑人强伦姧人妻| 麻豆久久久9性大片| 2018国产精华国产精品| 欧美极度丰满熟妇hd| 五十路丰满中年熟女中出| 无码人妻丰满熟妇区毛片18| а天堂中文在线官网| 中文字幕一区二区三区精彩视频| 无码人妻视频一区二区三区| 亚洲av无码一区二区三区不卡| 情人伊人久久综合亚洲| 色诱久久久久综合网ywww| 丰满大爆乳波霸奶| 中日韩精品无码一区二区三区| 男女车车的车车网站w98免费| 日韩放荡少妇无码视频| 亚洲妇女水蜜桃av网网站| 污污污污污污www网站免费| 日本大骚b视频在线| 精品人妻av区波多野结衣| 性少妇freesexvideos高清| 精品久久久久久无码国产| 国产乱码一区二区三区| 一本一道av中文字幕无码 | 亚洲中文字幕无码av在线| 久久99精品国产99久久6尤物|